Our Process of Renovating a Bathroom. Step by Step Guide

  • Post author:
  • Post category:Blog
Master Shower with bench

Bathroom Renovation – Serving Mississauga

Eo_circle_green_checkmark.svg

New Bathroom In a Week

Eo_circle_green_checkmark.svg

Free Estimate

Eo_circle_green_checkmark.svg

No Hidden Fees

Eo_circle_green_checkmark.svg

Built by Proffessionals

How we renovate a bathroom ? Step by step description

Sergio from Any Bathroom Inc. says “Once we finalize all the bathroom design details and bathroom finishings & set up a start date for a Reno project – We begin shopping and ordering & supplying bathroom fixtures like large format tile, shower system , vanity , vanity mirror and faucet. 

DAY 1. Is a demolition day where we carefully cover the stairs with drop sheets and begin to remove the old tub ,remove old vanity, remove old bathroom tiles, old bathroom fixtures.

Day 2. Once bathroom demolition is complete we start working on a bathroom plumbing.Our Licensed Plumber will be Removing an old P traps, removing and old shower system, and installing a new shower system with rain head and handheld , we also install a new tub or install new shower drain for a stand up shower or walk in shower , at that point we may also create a curbless shower or add a shower bench.

Day 3. Bathroom Electrical work is always performed by a licensed electrician. we are Changing a bathroom switches and adding a new receptacle, Any Bathroom Inc. will also change an exhaust bathroom fan or add a new bathroom if needed. 

Day 4. Any bathroom Inc will start preparing a bathroom for tile installation that includes installing a waterproof backerboard or denshield, drywall and apply waterproofing materials like schluter systems or prove to a wet areas around the perimeter of the tub or shower area. At that point Any Bathroom applies drywall mud patching up all the old  screw holes and old drywall imperfections.

Day 5. Tile installation . We usually start tiling the shower floor with a mosaic tiles or a non slip tile designed for bathroom shower floor.

Day 6. Any Bathroom Inc. will start the final stage of completing a bathroom. Starting with a  two generous coats of bathroom primer following by 2 coats of durable and washable wall paint from Benjamin Moore.  

Bathroom Renovation Cost In Mississauga

How much should you budget for your bathroom remodel? Here’s how to make a rough prediction of bathroom remodeling costs in Meadowvale Mississauga. The main variables are:

icone-point-d-interrogation-question-jaune

Size of your bathroom, typically determined by the number of bathroom fixtures and the room’s square footage.

icone-point-d-interrogation-question-jaune

Finish level — from budget to luxury, of all the materials, fixtures and finishes for your renovation.

icone-point-d-interrogation-question-jaune

Scope — Are you just replacing fixtures and finishes? Are you changing the floor plan, including moving walls and utilities?

icone-point-d-interrogation-question-jaune

Services — Do you just need construction work? Do you need professional design or architecture services?